Grifols, Grangecastle, Dublin
Client Activity: To process and distribute frozen blood plasma.
Client Requirement: To achieve an unbroken cold chain and environmentally secure loading dock facility, with provision to open vehicle doors into the loading dock.
Solution: MCR Engineering provided 7no Esidock loading dock systems, technical features include 4 sided environmental dock seal, telescopic lip dock leveller and retractable dock bumpers.