Glanbia Lough Egish

December 12, 2017 |

MCR were engaged by Glanbia with Malone O’Regan acting as consultants to provide a loading bay solution at their expanded UHT facility. The brief demanded the best possible sealing at the loading bay which is the most vulnerable point in the building to pest ingress. With this in mind MCR installed our ESIDOCK loading bay solution which provides for a four sided seal around the trailer while the loading/ unloading process takes place. MCR also provided on grade access, fast acting, Fire shutter and steel doors for the project.