  • Grifols, Grangecastle, Dublin

    Client Activity: To process and distribute frozen blood plasma.

    Client Requirement: To achieve an unbroken cold chain and environmentally secure loading dock facility, with provision to open vehicle doors into the loading dock.

    Solution: MCR Engineering provided 7no Esidock loading dock systems, technical features include 4 sided environmental dock seal, telescopic lip dock leveller and retractable dock bumpers.

  • Aryzta, Grangecastle, Dublin

    Client Activity: The manufacture and distribution of frozen food products

    Client requirement: To achieve an environmentally secure loading dock facility and to increase the operational and cost efficiency by reducing chill air loss through the loading docks.

    Solution: MCR Engineering provided 16no. Constant Contact Foam Pad Dock Seals, technical features include auto adjustable dock seal head curtain, heavy duty foam pad dock seals with wear resistant pleats, spring steel dock bumpers 1no raised 100mm above ffl.

  • Vitacress, Andover U.K.

    Client Activity: The cultivation and distribution of Watercress prepacked salads.

    Client Requirement: To achieve an environmentally secure loading facility, with provision to open vehicle doors into the loading dock.

    Solution: MCR Engineering provided 13no. Esidock loading dock systems, technical features include 4 sided environmental dock seal, telescopic lip dock leveller and retractable dock bumpers.

  • Corby Rock

    MCR Engineering provided a solution for our client in the grain industry, the nature of the clients business meant the requirement for large openings had to be maintained while provided ease of access for large vehicles while containing designated areas while the trucks were bulk loading.

  • Celtic Pure

    MCR Engineering delivered 5 Loading bays to Celtic Pure, the client opted for upgraded ‘Constant Contact Head Seal’ arrangements on the exterior envelope for a greater environmental seal and prevention of external weather ingress.

  • Covanta DWTE (new waste Incinerator Poolbeg)

    MCR were engaged by a number of contractors under the overall supervision of the PM Group to provide external wall large on grade access door solution, internal Roll fast and Fire shutter solutions where required and specialised large automated gates for external site access control and internal dump truck control. We used the Loading Systems 601 Sectional door solution on external opes to provide an insulated solution to complement the external wall cladding, some doors with personnel pass doors incorporated. For the automatic gate requirement we used the BALU aluminium construction heavy duty gate(up to 19000mm span) with 15 year paint guarantee for the marine environment.

  • Glanbia Lough Egish

    MCR were engaged by Glanbia with Malone O’Regan acting as consultants to provide a loading bay solution at their expanded UHT facility. The brief demanded the best possible sealing at the loading bay which is the most vulnerable point in the building to pest ingress. With this in mind MCR installed our ESIDOCK loading bay solution which provides for a four sided seal around the trailer while the loading/ unloading process takes place. MCR also provided on grade access, fast acting, Fire shutter and steel doors for the project.

  • BWG Foods NDC

    MCR were retained by RBH Project Management on behalf of the BWG Group to act as the main contractor to refurbish 12 no. existing loading bays and create 6 no additional loading bays including all civil works. MCR completed all bays with our Constant Contact Dock seal which provides the best possible seal in the conventional loading bay situation.

HEAD OFFICE

  • Unit 1, The Capel Building, Mary's Abbey, Dublin 7.
  • (01) 889 9100
  • info@mcrgroup.ie
  • Mon - Fri: 7:30 - 18:00

GET IN TOUCH

  • This field is for validation purposes and should be left unchanged.
Top
MCR Group